Soil-nailing technology is suitable for hilly regions, and we will ensure proper maintenance works are done so that motorists can pass the area without any hesitation of landslides.” ...
I-40 through the Pigeon River Gorge is expected to reopen on March 1 Over 2,000 feet of soil nail wall was installed to stabilize the road. The stretch of road supports over 26,000 daily vehicles.
The East Verot School Road Bridge repair will take approximately six months and utilize innovative Soil Nail Wall construction. The Beau Pre Road Bridge will be closed for approximately 10 months ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results